
Industry Application
Construction Site Lighting
Temporary lighting for building sites
Customer Pain Points
What Goes Wrong On These Jobs
- Site lighting has to be dragged from floor to floor every day, so anything fragile fails within a week.
- Every extra transformer or adaptor on a site is one more thing to lose, trip over or damage.
- Electricians want to run one circuit for a whole floor instead of a lamp every few metres.
- Site lighting is exposed to rain, dust and mechanical impact from the first day of the job.
Our Answer
How Our Products Handle It
- Our construction LED strip light is a patented product supplied on a drum in 5m, 10m, 20m/25m and 50m packaging with male and female moulded connectors already fitted.
- It runs directly on 110V or 230V mains with no adaptor: one power cord carries up to 50 meters at 110V and up to 100 meters at 220V.
- The strip is rated IP67 and has been tested to IK10, so it survives water, dust and impact on an open site.
- A plug with fuse is fitted for safer use, and the strip is available in cool white, warm white, yellow, blue, red, green and RGB.
Recommended Products
Each of these is chosen on published specification, not on a general claim. Open a product page for the full datasheet.

110/230V Strip Light
5M packaging LED Work Light Strip
View Details
110/230V Strip Light
10M packaging LED Work Light Strip
View Details
110/230V Strip Light
20-25M packaging Portable LED Work Light Strip
View Details
110/230V Strip Light
50M packaging Portable LED Work Light Strip
View Details
110/230V Strip Light
ETL CE 2835SMD 180P LED Strip light
View DetailsInstalled Photographs
Real installations of our strip light, supplied by the customer or photographed on site.




Delivery Process
From Enquiry To Delivered Project
-
01
Requirement Review
Send the run length, mounting condition, voltage, colour temperature and destination market. We check what the site actually needs.
-
02
Specification And Sample
We confirm the model, issue the specification and can send a free sample so you can test it before committing.
-
03
Production And Aging Test
Built on our own lines, followed unit by unit by QC, with an aging test of more than 24.5 hours before packing.
-
04
Shipment
EXW, FOB, C&F or CIF through our own ocean and air transportation branch, with consolidation available.
FAQ
Construction Site Lighting FAQ
Which product should I start with for this application?
How far can one power cord feed?
Is the product certified for my market?
Can you supply a sample before the project order?
Can the lengths and packaging be changed?
Can you handle shipping and consolidation?
Talk To Us About Your Construction Site Lighting Project
Send the drawing, the run length or a photo of the site. Our engineers will come back with a model, a layout suggestion and a price.
No forms. Talk to an engineer on WhatsApp 0086-13902885704 or email [email protected].