Indicating Life Signals and Caring for People's Health
Our Quality System - Trumor Ltd

Our Quality System

Quality First is the discipline embedded in every step of our manufacturing process, because the reliability of a monitoring consumable affects patient safety directly.

Quality Objective

Drive defects to zero through the relentless pursuit of single-digit PPM.

  • ISO 13485 Quality Management System
  • CE Mark
  • FDA Compliance
Production QC Flow

Three Inspection Stages on Every Order

IQC inspection stage at Trumor Ltd

IQC

Incoming inspection of connectors, wires, cables, terminals and accessories. Items checked: appearance, shape, materials, dimension, size and colour, against specifications, drawings and samples.

IPQC inspection stage at Trumor Ltd

IPQC

In-process inspection across cutting, stripping, crimping, injection and assembly, using first article inspection, patrol inspection, self inspection, mutual inspection and dynamic inspection throughout the process.

OQC inspection stage at Trumor Ltd

OQC

Outgoing inspection of packing, labels, marks, appearance, dimensions and electrical performance, using micrometer, caliper, electronic scale, hardness tester, microscope and cable testing machine.

QC Instruments

The Bench Your Batch Passes Through

Micrometer, caliper, electronic scale, hardness tester, microscope and cable testing machine, used at the stages described above.

Horizontal insertion force test machine on the QC bench, used to verify that a connector m

Horizontal insertion force test machine on the QC bench, used to verify that a connector mates and holds within specification.

Bench inspection and measurement of assembled parts against drawings.

Bench inspection and measurement of assembled parts against drawings.

Electrical performance testing before packing.

Electrical performance testing before packing.

Process inspection during assembly.

Process inspection during assembly.

FAQ

Questions About Quality

Which quality certifications do you hold

Our quality management system is ISO 13485, and we state compliance with CE Mark and FDA regulations. Certificate copies are sent on request.

How many inspection stages does a product pass

Three - IQC, IPQC and OQC - plus first article inspection at the start of a run.

What is your defect target

Single-digit PPM, working towards zero defects.

Can we audit your factory

Audit requests are welcome; contact us by email or WhatsApp to arrange.

Ask for the Documentation

Tell us the product family and the market you are selling into and we will send the relevant certificates and registration paperwork.