OEM And ODM Development For Portable Electronics
From an existing platform to a product that is recognisably yours
Why This Matters
Most projects here start from an existing platform rather than a blank sheet. That is deliberate: the tooling, the circuit and the certification path are already proven, so the work goes into the parts a buyer actually sees.
Fresh Lemon has integrated development and manufacturing in-house since 2015, which is why a colour, finish or kit-contents change is a conversation rather than a project.
Six Steps From Enquiry To Delivery
Each step has an owner and a written output, which is why a change at step four does not restart the project.
- Requirement
You send the target specification, the price point and the market. We come back with the platforms that already meet it rather than promising a new one.
- Specification
Capacity, ports, output ratings, colour, finish, print method and kit contents are fixed in writing before any sample is cut.
- Sampling
A sample is produced against the agreed specification. Sample cost and timing are agreed by email first.
- Approval
Artwork, colour and packaging are approved in writing. Nothing goes to the line before that.
- Production
Power bank models such as FL-P006 and FL-P010 carry a stated 15 to 20 day production lead time. Speakers including BS100 are quoted at 30 to 40 days.
- Shipment
Loading port is Shenzhen. Your forwarder collects, or we arrange it with ours.
Other Parts Of The Service
Models Customers Start From

FL-FB042 Magnetic Wireless Power Bank With Three Built-In Cables
10000mAh magnetic pad plus three captive cables in a 21mm body

FL-P002 ABS Power Bank 10000mAh In Five Colours
Black, green, red, white and yellow, 137 x 72 x 18mm

FL-B003 Dual Passive Radiator Bluetooth Speaker IPX5
97 x 76 x 32mm, 3.5W, passive radiators either side for bass

D01 Mini Electric Shaver With IP67 Rating And Power Display
67 x 46 x 40mm, 100g, IP67, 300mAh with battery level display
OEM And ODM Development Questions
Do you develop completely new tooling?
What is the difference between OEM and ODM here?
How long does sampling take?
Is there a development charge?
Send Us The Brief
The more detail you give at the start, the faster the first sample is right. Model, quantity, market, branding and packaging is enough to begin.
We reply from [email protected] during Monday to Saturday, 09:00 - 18:00 China Standard Time (GMT+8).