Planning A Promotional Power Bank Order
Working backwards from the campaign date
Most promotional orders fail on the calendar rather than the product. Here is the sequence that works, using the lead times stated in this catalogue.
Start from the date the product must be in hand
Not the campaign launch - the date stock has to be in your warehouse. Then subtract shipping, then production, then artwork approval. Whatever is left is your decision window, and it is usually shorter than people expect.
Production lead time
FL-P006 and FL-P010 carry a stated production lead time of 15 to 20 days after artwork approval. Speakers such as BS100 are quoted at 30 to 40 days. Confirm the figure for your exact model at quotation.
Artwork approval is the step that slips
Production does not begin until artwork is approved in writing. Building two rounds of proof into the plan costs nothing; discovering you need them after the slot is booked costs the slot.
Choose the model for the print, not only the price
Anodised aluminium takes a laser mark and no colour. Moulded ABS such as FL-P002 takes full-colour print across five housing colours. If the campaign has a strong colour identity, that decision comes before the price comparison.
Packaging and kit contents
Blister box, colour paper box or customised packing, and cable, manual and insert card specified per order. Each addition is a lead-time item, so decide them at the same time as the product.
What To Take Away
- Plan backwards from warehouse date, not campaign date.
- Stated lead times here are 15 to 20 days on power banks, 30 to 40 days on BS100.
- Artwork approval gates production - build proof rounds into the schedule.
- Housing material decides the print method; decide it before the price comparison.
Models Referenced In This Guide
More Buying Guides
How To Choose Power Bank Capacity For A Branded Range
What 5000, 10000 and 20000mAh actually mean on a shelf
Read moreMagnetic Wireless Power Banks Explained For Buyers
What the magnet does, what the wattage means, and where it fails
Read moreReading A Bluetooth Speaker Specification Sheet
Driver size, output power, chipset and battery - what each one tells you
Read moreQuick Answers
Start from the date the product must be in hand?
Production lead time?
Where can I check these figures?
Ask Us Before You Commit The Order
Send the model and the quantity and we will confirm every figure in writing before you place the purchase order.
We reply from [email protected] during Monday to Saturday, 09:00 - 18:00 China Standard Time (GMT+8).


