Kapur Sculpture Art (Shenzhen) Co., Ltd. — custom metal sculpture manufacturer in Shenzhen China [email protected] WhatsApp +86 189 2340 7862
Quality Control and Factory Inspection sculpture project by Kapur Sculpture
Home›Solutions›Quality Control and Factory Inspection

Quality Control and Factory Inspection

Large custom sculptures must be fabricated to exact dimensions and finished to gallery standard, then packed to survive ocean freight and delivered on a schedule that fits the project timeline. Kapur Sculpture manufactures stainless steel, corten steel and fib

Solutions

Quality Control and Factory Inspection

Large custom sculptures must be fabricated to exact dimensions and finished to gallery standard, then packed to survive ocean freight and delivered on a schedule that fits the project timeline. Kapur Sculpture manufactures stainless steel, corten steel and fiberglass sculptures to your drawings or reference photos, with production taking 25-30 days and transport 15-20 days, allowing the piece to be planned into the fit-out programme rather than rushed at the end.

Pain Points

What Usually Goes Wrong

  • The final sculpture dimensions are not known until the space is built, so the piece must be made to order
  • Polished stainless steel surfaces show every weld imperfection unless joints are ground and polished
  • Coastal or high-moisture sites require material grades that resist corrosion over time
  • Unplanned delays in production or shipping disrupt project timelines and opening dates
  • Buyers cannot inspect the factory before the crate is sealed, so proof of quality is needed
Requirements

What the Project Needs

  • A sculpture built to the actual space dimensions, not a standard catalogue size
  • A finish that performs under both daylight and artificial lighting with no visible welds
  • A material grade selected for the exposure environment, including salt air or indoor humidity
  • A production window that can be scheduled into a project timeline with no ambiguity
  • Digital photographic evidence at each stage before the crate is closed
  • Packing that protects the surface during handling from port to installation site
Typical Scenarios

Where the Work Lands

Lobby and atrium centrepieces viewed from multiple angles and floors

Entrance forecourts and porte cochere landmarks in public spaces

Resort gardens and pool decks exposed to sun, wind and moisture

Restaurant and bar interiors using stainless steel wall decorations

Spa and corridor walls with mirrored recessed panels or reflective surfaces

Ballroom and event space feature walls with custom metal forms

Process

How a Project Runs

  • Send the space dimensions, sightlines and a reference image or drawing
  • Agree on form, material grade and finish with our in-house design team
  • Fabricate the frame and shell, then grind and polish the surface as required
  • Inspect at each stage and send digital pictures for approval before moving forward
  • Crate in an outer standard wooden case with inner plastic or foam for protection
  • Coordinate base or fixing detail during design to match site installation
Delivery Capability

What We Commit To

  • 25-30 days production time and 15-20 days ocean transport
  • Weekly reports sent during the production window
  • Inspection at all stages from production to loading on vessel
  • Your own QC team or a third party inspector welcome to visit the factory
  • OEM and ODM orders accepted for hotel groups, developers and design studios
How We Work

From Your Drawing to the Vessel

Every project runs through the same six stages, and you see photographs at each one before the next begins.

1

Enquiry

Send dimensions, a reference photo or drawing and the site conditions

2

Design

Our designers confirm the form, material grade and finish with you

3

Fabrication

Frame built, panels cut and formed, shell welded section by section

4

Finishing

Seams ground back and the surface polished or left to weather

5

Inspection

Our QC team checks each stage and sends digital pictures

6

Crating

Outer wooden crate, inner plastic or foam, then loading on vessel

FAQ

Questions About Quality Control and Factory Inspection

Can you make a sculpture to our exact space dimensions?

Yes. We build to your drawings or reference photos, and any size can be customized.

How far in advance should we order for a project opening?

Allow 25-30 days for production and 15-20 days for ocean transport, plus your site installation window.

What material should we use for a seaside resort?

316 stainless steel is recommended for coastal exposure. 304 stainless steel is suitable for inland or interior use.

Can we see the sculpture before it ships?

Yes. Our QC team inspects at every stage and sends digital pictures. Your QC team or a third party inspector can visit the factory.

Do you accept orders from our design team's drawings?

Yes. We accept orders from your drawings, photos, or concept sketches. OEM and ODM work is welcome.

How is a large polished sculpture packed for shipping?

In an outer standard wooden crate with inner plastic or foam to protect the surface during transit.

Discuss Your Quality Control and Factory Inspection Project

Send the site details, the programme dates and any drawing you have. We will come back with material options and a production window.