Producing and researching amusement attraction rides in Henan since 2009 · 116 models, 39 held in stock Enquiries answered 24/7 by WhatsApp and email, Asia/Shanghai GMT+8 [email protected] +86 133-7395-6770
  1. Home
  2. Deployment Scenarios
  3. Dressing A Town Square Christmas Market
16P Christmas Carousel referenced in this deployment scenario
Deployment Scenario

Dressing A Town Square Christmas Market

A six-week Christmas market in a town square, trading from late November to early January, with a stone surface, a height restriction set by surrounding buildings and a single trading window that has to pay for the whole year.

16P Christmas Carousel referenced in this deployment scenario
16P Christmas Carousel referenced in this deployment scenario

The Constraint

The attraction has to arrive already themed, read as Christmas from across a crowded square, and come out again before the January deep clean.

Where It Usually Goes Wrong

  • Six weeks of trading cannot absorb a two-week installation
  • Generic rides need dressing on site every year and stripping every January
  • Historic town centres often have single-phase supply only

What Gets Specified

A 16P Christmas Carousel, published at 16 seats over an 8m x 8m area 4m high on 220V or 380V at 3kW turning 3.5 laps per minute, paired with a 6 Riders Christmas Carousel at 2.4m high on 220V/1600W for under-fives where the supply is limited.

The Outcome

Two capacity bands covered on one pitch, both arriving finished, both within a single-phase supply where required.

Client names, contract values and quantities are not published by the source site and are not stated here. The equipment, dimensions and power figures below are taken from the BigJoys catalogue.

Process

How A Site Like This Gets Specified

Size Check

8m x 8m x 4m high set against the square's usable area and the height restriction.

Supply Check

220V single-phase confirmed as workable for the small carousel where three-phase is not available.

Theming

Christmas theming moulded into the FRP bodywork in the works, so nothing is dressed on site.

Test Run

Unit run assembled in the works before break-down and packing.

Loading

Loading photographs sent before departure.

Planning A Site Like This

Send the pitch or room dimensions, the clear height, the supply voltage and the trading window. A shortlist with specifications comes back by WhatsApp or email.