Voltage and Plug Configuration
One catalogue covering 100-120 V and 220-240 V programmes
Voltage and Plug Configuration at Tophome
How the Tophome range splits between dual rated and single region builds, and what to confirm before a split market order.
Dual Rated Bodies
The majority of the bread toasters are specified at AC 100-120 V and 220-240 V. The JE47B, JE103, JE103A and JE127 are quoted at 120 V, 220 V and 230 V. The JE128 and JE129 power juicers are specified at 100-120 V and 220-240 V.
Single Region Builds
The BT116 4 Slice is 220-240 V only. The BT120 with coffee maker is 230 V, as are the JE19 and the JE72. The blender range - the BL301AB, BL601, BL901, JE47C, JE47D and JE47E - is specified at 220-240 V 50 Hz.
Frequency
Dual rated models are quoted at 50/60 Hz or 50-60 Hz. The 220-240 V only builds are specified at 50 Hz.
Cord Sets and Plugs
The plug type is set against the destination market, not against the voltage. Tell us the country and we will confirm the cord set with the sample.
Rating Plates and Manuals
The rating plate and the manual follow the build. On a split programme these are the two items most often missed at the artwork stage.
Categories This Applies To
The Rest of the Decisions
OEM and ODM Manufacturing
Own brand kitchen appliance programmes built from a standard Tophome model
Certification and Compliance
GS, CE, RoHS, LFGB, UL, ETL, FDA and CB approvals for most products
Export Markets and Logistics
Kitchen appliances exported to Europe, the Americas, Africa, the Middle East and Asia
Voltage and Plug Configuration Questions
Practical answers, with the people and the numbers you would actually be dealing with.
Who at Tophome handles voltage and plug configuration
The Shanghai office on 0086-21-51699132 and the Ningbo office on 0086-574-27899358. Written enquiries go to [email protected].
Does voltage and plug configuration change the price
It can. Branding method, cord set, carton artwork and certificate scope all carry a cost, which is why we ask for them at the enquiry stage rather than after the quotation.
How early should voltage and plug configuration be settled
Before the first sample. Every item on this page is cheaper to change on a drawing than on a production run.
What do you need from us to start
Model numbers, destination market, annual quantity, voltage and plug type, and your branding requirement.
Start With Voltage and Plug Configuration
Send us the model numbers and the market and we will confirm what this involves for your programme.