Home / Quality
Quality

What is in the building, and what can be proved

Photos from the Wenzhou line and the checks each order passes. Where there is no evidence, the page says nothing.

Lift weight test rig
30 daysusual lead time
35–45 dsome references
FCL · LCLfrom Wenzhou
T/T · L/Cpayment

Six steps

Material

Material

Zamak #3 ingot, ABS or PP resin

Casting

Casting

From tooling Virtue owns

Polishing

Polishing

By hand

Plating

Plating

Five standard tones

Assembly

Assembly

Arms, bars, caps, screws

Lift test

Lift test

Logged per reference

Checkpoints

  • Incoming material before casting or moulding
  • In-process checks at casting, moulding, polishing and plating
  • Lift tests on load-bearing models
  • Tone compared with the approved sample
  • Pre-shipment inspection
  • Count and pack verified before sealing

Paperwork per order

Certificates and reports are held at the factory and sent for the order that needs them; ask before confirming.

  • Packing list
  • Material description
  • Lift test record for load-bearing items
  • Photos of the loaded container on request

Something wrong?

Send photos and the reference number. With tooling and line both in-house, a batch can be traced directly.