Home / Quality
Quality
What is in the building, and what can be proved
Photos from the Wenzhou line and the checks each order passes. Where there is no evidence, the page says nothing.

30 daysusual lead time
35–45 dsome references
FCL · LCLfrom Wenzhou
T/T · L/Cpayment
Six steps

Material
Zamak #3 ingot, ABS or PP resin

Casting
From tooling Virtue owns

Polishing
By hand

Plating
Five standard tones

Assembly
Arms, bars, caps, screws

Lift test
Logged per reference
Checkpoints
- Incoming material before casting or moulding
- In-process checks at casting, moulding, polishing and plating
- Lift tests on load-bearing models
- Tone compared with the approved sample
- Pre-shipment inspection
- Count and pack verified before sealing
Paperwork per order
Certificates and reports are held at the factory and sent for the order that needs them; ask before confirming.
- Packing list
- Material description
- Lift test record for load-bearing items
- Photos of the loaded container on request
Something wrong?
Send photos and the reference number. With tooling and line both in-house, a batch can be traced directly.