MagWave finds and checks the supplier, watches the production run and books the freight — FOB, CIF or DDP. Since 2017 we have helped overseas buyers get what they ordered, at the landed cost they planned.
We are neither a supplier directory nor just a freight desk. We carry the job from the first factory shortlist to the pallet arriving at your door.
Before any deposit, business and export licences and certificate scope are checked against the entity that actually manufactures — and someone visits the floor.
Checks begin with raw materials and come back when 15–20% of the order is made, while fixing it is still cheap.
Transport mode, Incoterm and consolidation are planned as one decision, and the revenue-ton basis is verified before rates are compared.
Goods from different suppliers are gathered and inspected in China, then moved as a single FOB, CIF or DDP consignment.
Eleven items across five categories are currently listed. Each is bought against a written spec and checked at material, in-production and pre-shipment stages.

Magnetic wireless pad for MagSafe-ready phones.

App-set-up kit for self-install on a home network.

Dual-head winder for 3K–60K carbon fibre tow.

Wrapped column on a weighted base, cats under 15 kg.
Six stages, from your first email to delivery. Typical total: 4–12 weeks for most orders.
Share the product, specification and target budget. We review it within 24 hours.
Candidates come from 300+ vetted factories; licences and certificates are verified and capability is audited in person.
Samples take 7–15 days. The one you approve becomes the written production reference.
Materials first, then 15–20% and 50–60% production checks, then an AQL random final inspection.
Orders from several factories are combined in China so you pay for one shipment.
Forwarding, customs clearance and last-mile delivery on FOB, CIF or DDP terms.

Short answers; ask us for detail on your case.
It depends on the product and the factory. Standard goods such as packaging or homeware can start at 100–500 units; custom machinery and OEM parts usually need more.
Sea FCL/LCL (about 15–40 days), air (3–7 days), China–Europe rail (12–18 days), express (3–7 days) and all-in DDP door delivery.
T/T, PayPal, or L/C for larger orders. Usually 30% deposit to begin production and 70% before shipment; negotiable for long-term clients.
You receive photo and video reports from material check, production inspection and pre-loading sampling, with optional third-party lab tests.