Turnkey Projects And Parallel Systems

From the simplest to the most complex installation, our engineering department finds the solution and sees it through.

Turnkey Project

Generator sets for telecommunications, finance, IDC data centres, military equipment and other specialised application fields. Standard generator sets are used for hospitals, real estate, mining, power plants, transportation, factories and other fields.

Customers with engineering experience, local requirements and the latest technical requirements can see it for themselves. A professional environmental noise reduction project makes your minimum investment return the maximum. Unite Power has a professional team of engineers and technicians who complete the implementation of projects and ensure full compliance with technical specifications.

What you should do is tell us what you need, and we will arrange everything for you.

Discuss A Project
1

Pragmatic approach, the secret of success

2

Understanding of users' needs

3

Assessing needs accurately

4

Focusing on practical solutions

5

Absorption of innovative solutions

6

Designing a complete optimisation program

7

Construction and performance testing

8

On-site installation

9

Ensuring technical tracking and maintenance

Parallel System

Why Consider A Parallel System

The Kangsheng parallel system is 100 % integrated and factory tested for compatibility and reliability, with advanced control systems and circuit breakers.

Redundancy

Redundancy is the backup of the backups, which ensures that a critical load will not be damaged. When a generator set needs an overhaul, other generators can provide power protection for critical loads. If a generator set fails, you still have other backup sets.

Expansion and scalability

The parallel system is designed to let users buy a system that suits demand now and extend it easily when demand increases, so you never need to worry about outgrowing the system.

More competitive prices

In most cases two or more paralleled sets provide the same power output as a single high power set while saving cost.

Saving operating cost

When one set can satisfy the load demand, operation is more efficient. The parallel system shuts down redundant units automatically when load demand is low, saving fuel, reducing running hours and extending the service life of the sets.

Fast delivery time

The parallel system is a standard product. There is no need for special custom design, so it can be delivered more quickly than other parallel systems.

FAQ

Project FAQ

Can you handle a turnkey project?

Yes. Our engineering department covers generator selection, equipment room layout, noise reduction design, installation, performance testing and after-sales tracking. Parallel running systems are supplied as a standard product, so delivery is faster than a custom designed system.

Planning A Power Project

Send the load profile and the site conditions and our engineering department will propose the system.