TJ-Teck Co., Limited · Chang'an, Dongguan Contact: Murata +86-186 6641 8550 · [email protected]
Home / Knowledge / What the DFM report covers

Knowledge

What the DFM report covers

Before mold construction, TJ-Teck studies the 3D model and issues a DFM report covering the items below.

  • De-molding Direction
  • Inserts Design
  • Parting Line
  • Slide Design & Steel Line
  • Draft Angle Analysis
  • Lifter Design & Steel Line
  • Mold Layout
  • Sharp Steel
  • Filling System
  • Wall thickness
  • Gate Define
  • Ejection system
  • Undercut and Proposal
  • Markings and Graining

That list is the whole published scope. If a topic is missing — steel hardness, cycle target, cosmetic standard — it has to come from the customer in the RFQ.

Send 2D, 3D, or a sketch

TJ-Teck quotes to your standard in 1–3 working days and can suggest a mold approach against your budget.