FOB Shanghai / Ningbo · 30-40 days lead time
Request a quote
Aluminium Tube & Oxidation

Aluminium Tube & Oxidation

Our own aluminium pipe production line and oxidation workshop.

Why it matters for a rotary airer

An airer arm is an extruded section carrying a cantilever load at full extension. The arm sections across this range - L25 x W12, L25 x W15, L29 x W19, L30 x W28 and L36 x W30 mm - are what separates a 40 m airer from a 60 m one, and they are made in house rather than bought in.

The pipe line

The factory runs metal pipe production machines, injection machines and clothes line machines. Centre poles run from D32 to D45 mm, with wall thicknesses specified against the line length the pole has to carry.

The oxidation workshop

Anodising is done on site. For coastal and high-rainfall markets this is what removes the corrosion path that ends a powder-coated steel airer's life.

What this means for a buyer

Section changes and finish changes are scheduling decisions inside one plant, not a chain of subcontractors. That is what makes a 30-40 day lead time realistic on a specified order.

Questions

Frequently asked questions

How long does it take to set up?

Production lead time is 30-40 days. Artwork approval, colour matching and first-article approval sit in front of that and depend on how quickly proofs come back.

Is there a tooling charge?

Colour changes and print changes carry none. A new moulding or a handle logo insert does - tell us the annual quantity and we will quote it.

What do you need from us to start?

Vector artwork, a colour reference, the annual quantity, the destination market and the pack format.

Aluminium Tube & Oxidation

Send the brief and we will come back with what it costs in money and in lead time.