FECH Electronic Limited

Production and Quality Control

With years of experience producing computer accessories, FECH has established improved and standard production lines, from raw wire making and tooling design, through mould and assembly processing, to inspection and a detailed examination system.

  1. Step 1

    Raw Wire Making

    Wire is drawn and made in house rather than bought in as finished cable.

  2. Step 2

    Tooling and Mould Design

    Tooling and mould design is handled by FECH for the connectors it assembles.

  3. Step 3

    Mould and Assembly Processing

    Over-moulding and assembly run on the standard production lines.

  4. Step 4

    Inspection and Examination

    Finished product passes inspection and a detailed examination system before shipment.

Production Areas

Four Areas Inside the Plant

Factory Building at FECH Electronic Limited
Factory BuildingThe FECH plant in YuNing Industrial Park, HengLi Town, DongGuan.
Molding Workroom at FECH Electronic Limited
Molding WorkroomConnector over-molding and assembly benches.
Wire Manufacturing at FECH Electronic Limited
Wire ManufacturingRaw wire drawing and extrusion equipment.
SMT Workroom at FECH Electronic Limited
SMT WorkroomSurface-mount line for converter and adapter boards.

Answers

Frequently Asked Questions

Does FECH make its own wire?

Yes. FECH production lines start at raw wire making before tooling design and mould and assembly processing.

How is quality checked?

Finished product goes through inspection and a detailed examination system before it leaves the factory.

Which production areas are there?

The company profile shows the factory building, the molding workroom, wire manufacturing and the SMT workroom.

Where is FECH Electronic Limited located?

FECH Electronic Limited is at YuNing Industrial Park, HengLi Town, DongGuan City, GuangDong Province, China, postcode 523477. The telephone and fax number is 86 769 8312 5353.

Which markets does FECH export to?

FECH products have been exported to Europe, the Americas, Asia and the Middle East since 2001.

Next Step

Ask About Capacity and Lead Time

Tell us the models and volumes you are planning and we will confirm what the plant can deliver.

Email Enquiry