Manufacturer since 2004 · Hangzhou, China +86 571 61715080 · [email protected]

Racket Production Path

A buyer-facing path built from the factory process and OEM statements on the original site.

Start An Inquiry

Stages

Material prepare

Frame wire and raw shafts must be staged before shape.

Workroom board starts at material prepare.

Shape and fit

Throat and head must match the mold before paint.

Board lists shape, then fit T and adjust shape.

Painting and waterlabel

Color and decal must survive grip and stringing.

Painting then waterlabel and drying are named on the board.

Stringing

In-house capacity may not cover a large lot.

Workroom text states stringing sent out of the factory takes 7 days for 1000 to 5000 pieces.

Grip, print and pack

Retail pack must match the PO.

Board lists wait 24 or 36 hours, tight string, grips, fit printing, packing, finished.

Questions Buyers Ask

Racket Production Path follows the factory process published on the workroom and vision pages.

No. Only the 3 production lines, 5 packing lines and 20-45 day lead time from the source site are used.

Email [email protected] with the model name.

Request A Quote For Racket Production Path

Send the model and the artwork question on the first note.