Home
Products
Industry Applications
Solutions
Knowledge Center Download Center Exhibitions And Events Factory And Trust Center About Us Contact Us
Trust Center

Factory Capability Quality And Proof

Plant photographs, the production route, certificate documents, delivery record and the shows where you can meet the team.

13Years exporting massage products
6Production lines in Houjie Dongguan
5,000 m²Factory floor area
10,000 pcsDaily production capacity
100%Inspection before shipment

Fourteen Photographs From The Plant

Each image carries a caption describing the station or the step it shows.

The Bisd plant in Houjie Town, Dongguan, where all six production lines run
The Bisd plant in Houjie Town, Dongguan, where all six production lines run
Assembly line with fixtures and part bins staged at each station
Assembly line with fixtures and part bins staged at each station
Control board soldering station before boards go into a housing
Control board soldering station before boards go into a housing
Line staff in Bisd uniform assembling handheld units
Line staff in Bisd uniform assembling handheld units
Aging rack running units at 12V to catch early failures
Aging rack running units at 12V to catch early failures
Bench testing a unit against its function specification
Bench testing a unit against its function specification
Sewing station preparing the fabric parts of wraps and straps
Sewing station preparing the fabric parts of wraps and straps
Embroidery machines used for branded fabric parts
Embroidery machines used for branded fabric parts
Final assembly of a fabric wrap product on the line
Final assembly of a fabric wrap product on the line
Function check on a finished unit before it is packed
Function check on a finished unit before it is packed
Cartons sealed and labelled after the full inspection step
Cartons sealed and labelled after the full inspection step
Finished goods staged in the warehouse ahead of booking
Finished goods staged in the warehouse ahead of booking
Sales and engineering office handling projects and documents
Sales and engineering office handling projects and documents
A cordless calf wrap from the leg range being fitted
A cordless calf wrap from the leg range being fitted

Quality Control Route

Five checkpoints from incoming material to a marked carton.

Incoming Material Check

Cells, motors, films and fabrics are checked before they reach the line.

In Line Inspection

Soldering, assembly and function are checked at each station along the six production lines.

Aging And Function Test

Units run on aging racks and are checked for heating, vibration, airbag and pulse function.

Full Inspection Before Packing

Every unit is inspected before it is packed. This is not a sampling step.

Packing And Carton Check

Accessories, manuals, labels and carton marks are verified against the order sheet.

Certificates And Test Reports

Photographed from our own certificate wall. Copies are supplied with shipment documents on request.

ISO 9001 quality management system certificate held by Dongguan Beiside Electronics Co., Ltd
ISO 9001 quality management system certificate
amfori BSCI factory monitoring result held by Dongguan Beiside Electronics Co., Ltd
amfori BSCI factory monitoring result
CE certificate of conformity held by Dongguan Beiside Electronics Co., Ltd
CE certificate of conformity
CE certificate of conformity issued by UONE held by Dongguan Beiside Electronics Co., Ltd
CE certificate of conformity issued by UONE
CE test report held by Dongguan Beiside Electronics Co., Ltd
CE test report
EMC test report held by Dongguan Beiside Electronics Co., Ltd
EMC test report
FCC test report held by Dongguan Beiside Electronics Co., Ltd
FCC test report
LVD test report held by Dongguan Beiside Electronics Co., Ltd
LVD test report
RoHS test report held by Dongguan Beiside Electronics Co., Ltd
RoHS test report
KC Korea certification confirmation letter held by Dongguan Beiside Electronics Co., Ltd
KC Korea certification confirmation letter
UKCA attestation of compliance held by Dongguan Beiside Electronics Co., Ltd
UKCA attestation of compliance
Verified supplier certificate held by Dongguan Beiside Electronics Co., Ltd
Verified supplier certificate

Delivery And Service Record

The figures we publish on our own factory materials.

100%Order on-time completion rate
100%Order delivery rate
100%Check before shipment
0%Return rate
0%Customer complaint rate

Exhibitions Where We Show The Range

2024 April Vietnam Exhibition — Bisd booth
2024 April Vietnam Exhibition
2024 April Hong Kong Exhibition — Bisd booth
2024 April Hong Kong Exhibition
2023 November Vietnam Exhibition — Bisd booth
2023 November Vietnam Exhibition
2023 October Hong Kong Exhibition — Bisd booth
2023 October Hong Kong Exhibition
2023 October Autumn Canton Fair — Bisd booth
2023 October Autumn Canton Fair
2023 September Russia Exhibition — Bisd booth
2023 September Russia Exhibition

Factory And Audit Questions

Can we visit the factory
Yes. The plant is at 2nd Floor, Building 4, No. 42, Yuanqian Street, Dayuan, Houjie Town, Dongguan, Guangdong, China. Tell us your dates on WhatsApp and we will arrange the visit.
Do you accept third party audits
The factory has passed the amfori BSCI audit and holds ISO 9001 certification. Further third party audits and inspections can be arranged.
Is inspection by sampling
No. 100% of units are inspected before shipment.
What is your on time record
Our published figures are 100% order on time completion, 100% order delivery, 100% check before shipment, 0% return rate and 0% customer complaint rate.

Come And See The Line

Buyers are welcome in Houjie. Tell us your dates and we will arrange the visit and the samples you want to see.

[email protected]  ·  WhatsApp +86 133 7775 3944  ·  Monday to Saturday 09:00 to 18:00 China Standard Time